3,850.00 ر.ق
يشاهده 1 زائر فى الوقت الحالي.This was the subject of an entire year of research and development.
With regard to the production of each case, 68 different stamping operations are required for the three main components (bezel, caseband and case back). The machine tooling process requires 8 days of adjusting the machines for the bezel, 5 days for the caseband and 5 days for the case back. Prior to this process, developing a methodology for carrying out this series of operations took 120 hours, the drawings for the tools 130 hours, and implemention 180 hours. Each rough case involves 202 separate machining operations.
The design and execution of the watch demonstrates a complete conceptual approach to the movement, case and dial.
As a result, everything has been constructed according to an extremely rigorous specification, in the manner of the analytical engineering methods used in the design of Formula 1 racing cars where the chassis and the engine are developed in complete harmony.
The case is assembled with 20 spline screws in grade 5 titanium and abrasion resistant washers in 316L stainless steel.
المراجعات
لا توجد مراجعات بعد.